PORTFOLIO CAPITAL PLANNING · EXPANSION PATH

Plan capital across buildings when needs exceed one property.

A defined downstream service enabled by your building condition data. We turn assessment findings into a practical capital plan: prioritized repair and replacement needs, planning-level lifecycle estimates, deferred-maintenance visibility and repair-versus-replace decision support. Deliverables can include an annual work program, a multi-year capital improvement plan, funding scenarios and bundled project candidates, all with stated assumptions and scope limits.

1 CONDITION → 2 RISK → 3 LIFECYCLE → 4 PROGRAMMING

The capital planning decisions owners need answered

These outputs support owner budgeting and capital decisions. They are not a substitute for an enterprise asset-management strategy, a statutory inspection or a contractor bid. Scenario analysis is scope-dependent, and planning-level cost estimates are not guarantees.

FUND FIRST

What should we fund first?

Condition, criticality, and consequence of failure are compared across every building and system, so limited capital goes first to the assets where failure would disrupt operations, safety, or occupants most.

REPAIR OR REPLACE

Should we repair or replace?

Remaining useful life, repair cost, replacement cost, and risk are weighed for each asset, so you can defend which systems are replaced now and which are repaired and maintained to extend their life.

COST PLANNING

Where is our deferred maintenance backlog concentrated?

Cost estimates are grouped by building, system, and asset category—roofing, HVAC, electrical, envelope, site—showing which drive the largest share of your deferred maintenance and capital needs.

NEAR-TERM WORK

What must be done in the next 12 months?

Immediate and near-term needs—life safety, code, and imminent failure risks—are identified by location with supporting evidence, giving facilities and operations teams a defensible work list for the coming budget year.

CAPITAL PLANNING

What capital is coming over 5, 10, and 20 years?

Planning-level lifecycle and renewal estimates built from observed condition and cost data indicate when major systems are likely to approach end of useful life, the expected order of renewal cost, and whether each need is CAPEX or OPEX, forming the basis of a multi-year capital improvement plan and capital reserve planning. Estimates are refreshed as new condition data is collected.

SCENARIO MODELING · SCOPE DEPENDENT

What happens if we defer?

Where included in scope, the model shows how condition, risk, and cost are expected to change when specific work is postponed—so deferral is a deliberate decision, not a default.

SCENARIO MODELING · SCOPE DEPENDENT

What can we bundle into one project?

Where included in scope, work actions sharing a location, system, dependency, or timeframe can be identified as candidates for bundling into coordinated projects.

SCENARIO MODELING · SCOPE DEPENDENT

How do we reduce contractor mobilizations?

Where included in scope, spatially organized work-action records help group work by building and site so contractor mobilizations can be coordinated rather than repeated.

SCENARIO MODELING · SCOPE DEPENDENT

If our budget changes, how does risk change?

Where included in scope, funding scenarios show which projects stay in the plan, what is deferred, and how portfolio risk and backlog grow or shrink when budgets go up or down.

SCENARIO MODELING · SCOPE DEPENDENT

Which investments reduce the most risk per dollar?

Where included in scope, linking risk records to cost and work-action records helps compare candidate investments by the relative risk reduction each is expected to deliver across the portfolio. Next purchase: annual capital plan updates and funding-scenario refreshes keep your CIP current as budgets and conditions change.

Estimates, not bids. Every cost we provide is an engineering estimate at a stated level—screening, planning, scope-based, or project—with its assumptions, estimate date, escalation, and confidence documented. None is a contractor bid, quote, or guaranteed project price. Actual costs will vary with market conditions, final design, scope, and procurement, and should be confirmed through competitive bidding before commitment.

CAPITAL PLANNING SUPPORT

Cost information that supports the next decision

Cost information is linked to building, system, asset, condition finding and documented assumptions. Each estimate is labeled by confidence and intended use—from portfolio screening through project planning—so it supports budgeting without being mistaken for a bid or guaranteed price.

Cost levels

Precision increases and contingency narrows as the model and scope mature.

Level 1 · Lowest confidence · Widest range

Screening-level

Order-of-magnitude ranges used to compare needs across a portfolio and identify where deeper investigation is warranted. Intended for early prioritization, not for budgeting a specific project. Typical basis: unit costs by asset type and size, with broad allowances for access, demolition, disposal, installation, and contingency.

Level 2 · Moderate confidence

Planning-level

Asset- and system-based costs tied to observed condition and remaining-life judgment, used to build multi-year capital plans and reserve forecasts. Typical basis: materials, labor, and equipment by system, with allowances for access, demolition, disposal, installation, testing and commissioning, project management, design and engineering, and contingency, adjusted for geography and escalated to the planned year of work.

Level 3 · Higher confidence

Scope-based

Costs built from a defined scope of work—quantities, components, and access conditions drawn from field data in the model—to support project scoping and owner-side engineering decisions. Itemized across the full cost build-up, with stated labor and material conditions, estimate date, escalation, and confidence.

Level 4 · Highest confidence · Still not a bid

Project estimate

The most developed level, prepared for a specific project to inform funding requests and procurement planning. Reflects the full cost build-up with reduced contingency, tied to a stated geography, estimate date, escalation, and confidence level. It remains an engineering estimate, not a contractor bid.

Planning views

Because every cost is linked to the model, the same data can be viewed across the portfolio:

  • By building — needs and costs for each facility in the portfolio
  • By system — envelope, mechanical, electrical, plumbing, and other systems
  • By asset type — like assets grouped for comparison and replacement planning
  • By priority — ranked by condition, risk, and consequence
  • By year — multi-year capital and replacement timelines
  • By trade — work packaged the way it will be procured and performed
  • Deferred work — the accumulated backlog of postponed maintenance and renewal
Inputs and assumptions documented with every estimate

Cost build-up

  • Materials — equipment, components, and supplies required
  • Labor — trade hours and crew composition
  • Equipment — rigging, lifts, cranes, and tools
  • Access — working conditions, clearances, and occupied-space constraints
  • Demolition and disposal — removal and lawful disposal of existing assets
  • Installation — setting, connecting, and integrating new assets
  • Testing and commissioning — verifying performance before turnover
  • Mobilization — getting crews and equipment to the site
  • Project management — coordination and oversight
  • Design and engineering — drawings, specifications, and permitting support
  • Phasing — sequencing work to keep facilities operating
  • Contingency — allowances for unknowns at each level

Basis and confidence

  • Geography — location-specific cost adjustment
  • Labor and material conditions — market, access, and site constraints
  • Estimate date — the date the figures are based on
  • Escalation — adjustment for the planned year of work
  • Confidence — a stated level of certainty for every figure