top of page
CAPITAL PROJECT SUPPORT · EXPANSION PATH

Replacement studies after condition findings

When the Building Condition & Capital Planning Assessment identifies an aging system, recurring failure or a significant repair-versus-replace decision, a separately scoped replacement study compares alternatives, capacity, lifecycle considerations and planning-level cost.

Study Scope
  • Repair-vs-replace analysis
  • Equipment replacement studies
  • System alternatives & capacity evaluation
  • Feasibility & lifecycle cost analysis
  • Replacement scope, phasing & constructability
Deliverables · Not detailed design

Deliverables are planning-level: engineering evaluation, alternatives comparison, recommended direction, preliminary requirements, scope, budget considerations and next steps. Construction documents and detailed design are separate services.

Pathway: condition evidence → study scope → alternatives → recommended decision. Start with the building assessment so the next phase is scoped from documented findings.

ENGINEERING OUTCOMES

Decision support from a defined replacement study

A structured replacement study is organized around practical outputs owners can act on—from documenting existing conditions to defining the scope of the next project.

Study outputs are engineering recommendations. Final selection, budget, schedule, and scope decisions remain with the owner. Findings do not guarantee specific savings, performance, cost, or energy results.

â–  OUTPUT 01

Existing-Condition Understanding

Practical output: a documented baseline of equipment condition, maintenance history, and remaining service considerations.

â–  OUTPUT 02

Alternatives Analysis

Practical output: a side-by-side technical comparison of repair and replacement options, weighed against consistent criteria.

â–  OUTPUT 03

Sizing & Performance Requirements

Practical output: load, capacity, and performance criteria the selected approach should meet, stated as a basis for design.

â–  OUTPUT 04

Cost & Schedule Assumptions

Practical output: documented planning-level cost and schedule assumptions to support capital planning and procurement, without implying guaranteed savings.

â–  OUTPUT 05

Defined Next-Project Scope

Practical output: a clear scope identifying equipment, systems, and interfaces, giving designers and contractors a consistent basis for next steps.

NEXT PHASE

When to move to procurement or design

Move into procurement, design, or implementation support once the replacement study has confirmed system condition, remaining life, and capital priorities. If the need is still uncertain, start with a mechanical assessment: it establishes the facts first, so any next phase is scoped only when the findings justify it.

Optional: Value engineering is a separate phase, not included in the assessment. It is scoped only if study findings and your project goals call for it.

bottom of page