Commissioning and performance verification
A separately scoped service after equipment selection, replacement or project delivery. It helps owners confirm that installed systems operate as intended through agreed functional testing, controls review, trend analysis and documented deficiencies. If the need is not yet defined, start with the Building Condition & Capital Planning Assessment.
Scope boundary: verification is not a condition assessment or visual walkthrough. Testing, operating conditions, controls review and deliverables are defined in the engagement. Findings are not a certification, warranty or guarantee of energy savings.
- Existing-building commissioning support
- HVAC commissioning and functional performance testing
- Controls sequence verification
- Equipment performance review
- Deficiency identification and documentation
- Post-installation engineering review
- Operational performance evaluation

Final Reports
Documentation shaped by your agreed scope
Depending on what is included in the engagement, deliverables may include some or all of the items below, giving owners and project teams a clear record of activities performed, observations, and suggested next steps.
01 · PLANNING
Commissioning Plans
Where included within scope, a plan outlining systems, responsibilities, sequencing, and verification approach.
02 · EVIDENCE
Functional Review Records
Only where functional testing is in scope, the procedures followed and observations noted for the equipment and sequences reviewed. Not a pass/fail certification.
03 · EXCEPTIONS
Deficiency Logs
Where included, a log of issues observed during the engagement, their reported status, and items suggested for follow-up.
04 · EVIDENCE
Performance Observation Records
Where in scope, notes on how observed system operation compared with available design information under the conditions present at the time.
05 · RECOMMENDATIONS
Recommendations
Where included, prioritized suggestions for corrective actions, adjustments, and further evaluation, based on what was observed.
06 · HANDOFF
Final Reports
A summary report pulling together the activities performed, observations, open items, and recommendations within the agreed scope.
Which deliverables are provided, and what testing (if any) is performed, depends on the agreed scope, site access, operating conditions, and available information. Deliverables reflect observations made during the engagement only. They are not a certification, warranty, or guarantee of system performance or code compliance.
NEXT STEPS
Connecting Verification to Operations
Once commissioning or performance verification confirms how your systems actually run, the findings point to the right next step: operations support to sustain performance, asset-management enablement to plan renewals, or corrective project work to resolve deficiencies. Every path begins with a mechanical assessment that sets your baseline.